KSF Aero was selected for this project through the U.S. Air Force’s rigorous “Full Four Color” source selection process. This selection resulted in KSF Aero being selected as the “Best Value” and most technically competent contractor.
The C-5 ISO system consists of Wing Docks, Engine Docks and Fuselage Docks. All the Docks have a powered vertical lift system capable of 7 feet (2.14M) of travel to accommodate a fully jacked aircraft.
Each Dock section is equipped with powered Deck Sliders. The entire Dock system remains in place for aircraft docking & de-docking.
Wing stand sections behind the Engines have the ability to drop down low enough to provide adequate clearance for the Engines during aircraft docking & de-docking.